History of "Silur"
The choice of Khartsyzsk for construction of a new large factory was not accidental. There is a raw material base - metallurgical works of Makeevka, in 16 km, there are convenient access roads, and the town is in the centre of Donets Basin mining industry where the basic consumers of ropes are located. On November 11, 1949 the rope shop N1 was put into service with rated capacity of 75.3 thousand tones of ropes per year. The shop is specialized in output of bright and galvanized ropes, twisted and round-strand ropes. On December 3, 1949 the metal coating and automatic winding shop was put into operation with rated capacity of 29.4 thousand tones per year. The shop is specialized in output of galvanized semi-finished products, galvanized ACSR wire brass-plated for high pressure hoses, spring wire and galvanized rope wire.
Four main shops and enumerated auxiliary shops and services were put into operation. This concluded construction of the first phase of the plant complex. The second phase construction was undertaken in the 1960's. On May 20, 1962 the steel wire shop N4 was put into operation with rated capacity of 79.2 thousand tones of production per year. The shop is specialized in the output of wire for spring concrete, reinforcement ropes, spring wire, semi-finished round and shaped wire. On June 30, 1966 a new rope shop N2 began working. Its rated capacity is 44 thousand tones of ropes per year. The shop is specialized in the output of bright and galvanized round-strand, shaped-strand and locked coil construction ropes.
For many years Khartsyzsk steel wire rope plant was the only manufacturer of steel cord in Ukraine. On January 9, 1968 the steel cord shop was put into service with rated capacity of 11.3 thousand tones of steel cord per year. The shop produced brass-plated wire for bead rings of tyres, brass plated carbonic steel wire for production of high pressure hoses, etc. During its history the plant has been expanded and the equipment, technology and plant management system have been continuously improved. In 1993, the electric pipe-welding shop was put into operation with rated capacity of 20 thousand tones of products per year (water-gas steel pipes, details of water-gas supply structures and heating systems). On August 15, 1994 the functioning steel metal products shop was commissioned with a capacity of 3 thousand tones of nails per year. A year later, on July 19, 1995 the new metal mesh shop with rated capacity of 2 million m2 of mesh per year began to manufacture products. As a result of changes for the country from a planned economy under the USSR to a market economy it became a necessity to search for new methods of management. In 1994, a decision over reorganization of Khartsyzsk steel wire rope plant into Joint Stock Company "Silur" was approved. The development of new technologies and wide connections with foreign partners have allowed us to create some joint ventures of a varying structure. The following are examples of such joint ventures with the factory:
The major contribution to the development of the enterprise was brought by the building company created on the basis of former management by capital construction of the enterprise. Annually with an active participation of the construction firm more than 40 technical-organizational actions were introduced at the enterprise, modernization and installation of the new equipment, reconstruction of production sectors and other objects of the enterprise were made. On April 25, 2000 the own turbine shop was put into service with rated capacity of 7.7 MW that allowed the enterprise to become independent on instability of Ukrainian energy market. Board of directors constantly takes the progressive measures directed on assurance of steady rising of manufacture volumes, expansion of assortment and perfection of production quality. Manufacturing of fiber for steel-fibro-concrete was mastered. The policy of "Silur" from certification of separate kinds of production — to certification of all quality systems of the enterprise in "Ukr SEPRO", and then — receiving in 2000 of certificate "TUF-NORD" on correspondence of quality system to ISO 9002-94 requirements - became a guarantee of high reliability of "Silur" production in the world market. For several years beginning with 2000 "Silur" was recognized by Assembly of business circles of Ukraine as the prize-winner of a national rating "100 enterprises with dynamical development". Taking into account trends of world economy the management of the enterprise made a decision to optimize the manufacturing. As a result some types of production including steel cord were took out of production. The attention is concentrated on expansion the production capacity of the profitable production traditional for the plant (such as steel wire, steel ropes, mesh and fiber) that is widely used in the construction industry. For the purpose of complete satisfaction of the consumers' demands and improvement of the production quality "Silur" keeps conducting the equipment reconstruction and technological processes modernization. Nowadays "Silur" is a plant of various activities, its production is exported to more than 30 countries of the world. The enterprise manufactures steel wire and steel ropes according to national standards and international codes, and also according to individual technical requirements of the consumer. The plant also produces steel-aluminum wire, reinforcing stabilized ropes, steel mesh and steel fiber. After the certification audit of the quality management system that was carried out at "Silur" in September, 2009 the enterprise has obtained the certificate of correspondence to the new international standard ISO 9001:2008. | |
© 2000-2010 JSC “Silur” | |